1. Perform the following steps on all battery cabinets in the battery solution. a. Remove the cover in front of the start-up button and push the start-up button. • The PSU2 LED and the POWER LED will turn on. • The ABNORMAL and ALARM LEDs should remain off. b. Reinstall the cover in front of the start-up button.
Attach a signal cable3(not provided) to the male adapter connector in the correct length to reach from the battery cabinet to the UPS. As an alternative, you can also crimp the signal cable extensions. Ensure that the crimp point is inside the battery cabinet, not in conduits or cable trays outside the battery cabinet.
1. Manually set the battery breaker of each individual battery cabinet to the OFF (open) position to disconnect the battery power from the UPS. NOTE: The system BMS and rack BMS will still be operating. Restart the Battery Solution 1. Perform the following steps on all battery cabinets in the battery solution. a.
(D) Top Terminal Batteries. Where top terminal batteries are installed on tiered racks, working space in accordance with the battery manufacturer's instructions shall be provided between the highest point on a cell and the row or ceiling above that point. (E) Egress.
On multi-tier racks with more cells on one row than another, install larger number of cells on bottom row. Install rear side rail before installing cells. Locate side rail so overhang is equal on both ends of rack. Install plastic channel. Make sure all bolts are torqued as indicated in Table 1 before installing cells.
NO SEISMIC RACKS ARE TO BE BUTTED TOGETHER END-TO-END OR BACK-TO-BACK. 5.4 Batteries should be installed in a clean, cool and dry environment where there is minimal temperature variation. DO NOT locate batteries near HVAC ducts or exhausts, heat sources or direct sunlight.
DO NOT install in an airtight enclosure or room with no ventilation. 5.7 Rack-to-rack cable connectors provided by EnerSys are based on a rack spacing of 4 in. (100 mm); any length over this is the responsibility of the installer. 5.8 The floor/mounting platform must be reasonably level. Shimming up to 0.25 in.
1. Perform the following steps on all battery cabinets in the battery solution. a. Remove the cover in front of the start-up button and push the start-up button. • The PSU2 LED and the POWER LED will turn on. • The ABNORMAL and ALARM LEDs should remain off. b. Reinstall the cover in front of the start-up button.
Reinstall the left side panel on the left-most battery cabinet after interconnection. Push the third battery cabinet into position, align with the seismic anchoring (if any), level the battery cabinet, and interconnect with the other battery cabinets as described in step 2, step 3, and step 5.
Attach a signal cable3(not provided) to the male adapter connector in the correct length to reach from the battery cabinet to the UPS. As an alternative, you can also crimp the signal cable extensions. Ensure that the crimp point is inside the battery cabinet, not in conduits or cable trays outside the battery cabinet.
1. One AC/DC converter box can supply up to 10 battery cabinets. For 11+ battery cabinets, at least two AC/DC converter boxes are required. 2. Install one data log kit for each battery system. Installation Procedure