Virtual Power Plants: Integrating Residential Battery Storage in Ecuador
Virtual Power Plants are reshaping Ecuador''s energy sector by integrating residential battery storage and solar energy. With benefits like cost savings, grid stability, and
Ecuador's renewable energy is comprised of hydro power (5,419 MW), biomass (1550 MW), wind (71 MW), photovoltaic (29 MW), and biogas (11 MW). Hydroelectric power plants are in three regions: coastal (2 provinces), Andes (9 provinces), and Amazon (4 provinces).
Ecuador's energy shortage could result in a recurrence of power outages, particularly in the dry season of September through December. Ecuador has added minimal generation in recent years. In 2020, the Energy Ministry awarded two projects to the private sector: a 110MW wind farm (Villonaco), and a 200MW solar plant (El Aromo).
Ecuador had a peak demand of 5,110 MW in May 2025, and according to CENACE, electricity demand grows by 360 MW every year. Ecuador's energy shortage could result in a recurrence of power outages, particularly in the dry season of September through December.
In 2023, the Energy Ministry released tenders for a 500 MW renewable block (wind, biomass, solar), 400 MW Natural Gas Combined Cycle Power Plant (CCCP), and a Northeast Transmission System to supply the Ecuadorian oil system. From these tenders, only the Villonaco project has started construction as of August 2025.
PDF version includes complete article with source references.
Get technical specifications, ROI analysis tools, and pricing information for our BESS integration and energy storage solutions.
Av. de la Innovación 15
28042 Madrid, Spain
+34 91 133 2769
Monday - Friday: 9:00 AM - 6:00 PM CET