Powerware 9390 Integrated Battery Cabinet (Models IBC-S
Route the ground wire (from the field kit) from the ground stud in one battery cabinet, under the lower battery tray and through the cabinet-to-cabinet cable access area in the side of the
1. Perform the following steps on all battery cabinets in the battery solution. a. Remove the cover in front of the start-up button and push the start-up button. • The PSU2 LED and the POWER LED will turn on. • The ABNORMAL and ALARM LEDs should remain off. b. Reinstall the cover in front of the start-up button.
Attach a signal cable3(not provided) to the male adapter connector in the correct length to reach from the battery cabinet to the UPS. As an alternative, you can also crimp the signal cable extensions. Ensure that the crimp point is inside the battery cabinet, not in conduits or cable trays outside the battery cabinet.
1. Manually set the battery breaker of each individual battery cabinet to the OFF (open) position to disconnect the battery power from the UPS. NOTE: The system BMS and rack BMS will still be operating. Restart the Battery Solution 1. Perform the following steps on all battery cabinets in the battery solution. a.
(D) Top Terminal Batteries. Where top terminal batteries are installed on tiered racks, working space in accordance with the battery manufacturer's instructions shall be provided between the highest point on a cell and the row or ceiling above that point. (E) Egress.
PDF version includes complete article with source references.
Get technical specifications, ROI analysis tools, and pricing information for our BESS integration and energy storage solutions.
Av. de la Innovación 15
28042 Madrid, Spain
+34 91 133 2769
Monday - Friday: 9:00 AM - 6:00 PM CET